Cement pump used for bridges, culverts, mines, tunnels and other grouting reinforcement;spraying support; spraying with ashes and wiping inside and outside the wall, the roof.
Send Inquiry
Description

introduction

image001(001)


Application:

Cement pump used for bridges, culverts, mines, tunnels and other grouting reinforcement;spraying support; spraying with ashes and wiping inside and outside the wall, the roof. in addition, in the chemical sector, railway construction and other projects, it can be as the equipment for conveying the slurry.used for bridges, culverts, mines, tunnels and other grouting reinforcement; spraying support; spraying with ashes and wiping inside and outside the wall, the roof. in addition, in the chemical sector, railway construction and other projects, it can be as the equipment for conveying the slurry.


Product parameters

UB3C Grout Pump

1

Delivery Value

3m³/h

2

Working Pressure

1.5MPa

3

Power

4KW

4

Motor Speed

1440r/min

5

Outlet Hose Diameter

32mm

6

Inlet Hose Diameter

64mm

7

Vertical Delivery Distance

40m

8

Horizontal Delivery Distance

150m

9

Weight

250KG

10

Size(Length x Width x Height)

1035×480×900mm


Product details

image006(001)



Pressure gauge: shows the pressure index

image008(001)

Motor: to start the electricity, drive the machine operation, sustainable

image009(001)

Slurry outlet: conveying mortar and connecting oil pipe

image011(001)

Gear: drive the shaft, start the motor

image013(001)

Suction channel: connect the mixer and pour the mortar for transportation


Product Structure:

The mortar pump is composed of a reduction box, a pump body, a pressure relief valve and other parts, which are connected to a base made of channel steel.


Used:

1. Preparation before starting,Check whether the connection parts are loose, whether there is enough oil in the gear box.

2. Check whether the pump, pipe connection is sealed, whether the internal smooth, or the existence of dry gravel, dry ash, nails, vegetation, etc., ball valve, rubber hose is damaged.

3. Check the wire, the fuse is intact, the motor steering is right (clockwise).

4. When using,we should always pay attention to the work of the pressure gauge, when the working pressure is over, stop working. At this time should immediately open the pressure relief ball valve, so that pressure drop, eliminate the trouble and then restart and use.

5. Should always check the connection hose, flange,asbestos cord,so that the pressure does not occur leakage.


Related Products

image016(001)

image018(001)

image020(001)

image022(001)

image024(001)

image026(001)


Product features and applications

image029(001)


Product qualificatplications

image031


Company profile

image035(001)

Its products are widely used in road and bridge, municipal, high-rise buildings, power plant construction, geotechnical Anchorage, deep excavation works,etc. Our company is strong in technology, with a number of years in prestressing anchorage machinery professional and technical personnel, to provide users with inexpensive high-quality products and good after-sales service and professional technical advice.

We sincerely hope that can together with countries in the world to promote the application and development of our prestressed, create brilliant career.

image037

Our enterprise has already passed: ISO9001 and CE certifications.


OUR Factory

image041(001)


Deliver,shipping and serving

image043

image045

image047(001)


Packing Methods:

1.According To Customer's Requirement.

2.Plywood wooden cases.

3.The packing conforms to the international requirement


Shipping Methods :

1. For Bulk Orders: Shipped By Sea

(LCL and FCL shipment);


Payment Terms:

West Union, T/T And Paypal :

30% Deposit And Balance 70% Before Shipment.


FAQ

image049(001)