当前位置:
  • 1/2
Features: With multi - direction adjustable channel, can change the flow direction of the fluid timely.
Send Inquiry
Description

Steering valve commonly used in engineering machinery hydraulic power steering, internal have a pony, external double oil cylinder, with the aid of pilot work pressure in turn the steering wheel, the forerunner's pressure P by raft move into the little switch, reduce the intensity of artificial pull (steering wheel, steering operation is terminated, the valve core in the back, to cut off the power of motor power.

image001(002)

image003(001)

Features: With multi - direction adjustable channel, can change the flow direction of the fluid timely.

Function: a directional control valve with more than two flow forms and more than two oil ports. It is the valve that realizes the communication, cutting off and reversing of hydraulic oil flow, as well as the pressure unloading and the sequence action control.

Main operating cylinder, jack, hydraulic machinery and tools, manual pump, electric pump.


Product feature and application

image005(001)


Production detail

image007(001)

image009(001)

image001(001)

Pump head

Control valve

Steering valve

image012(001)image014(001)

Product qualification

image016

image018(001)

image020(001)

image022

Choose we !!! Liuzhou Lingqiao Prestressed Force Machinery Co., Ltd. is a prestressed product research and development, equipment, anchor production, construction as one of professional enterprises.

Its products are widely used in road and bridge, municipal, high-rise buildings, power plant construction, geotechnical Anchorage, deep excavation works,etc.

We sincerely hope that can together with countries in the world to promote the application and development of our prestressed, create brilliant career.

image024(001)

image026

image028(001)


Deliver,shipping and serving

image030(001)

image032(001)


Packing method:

Plywood wooden cases

image034(001)

FAQ

Question 1. Are you a manufacturer?

A: Yes, we are a professional manufacturer integrating industry and trade.


Question 2. What about the delivery date?

A: It takes 15 days ,about 35 days for the mass production.


Question 3. Is the minimum order limit for your produce?

A: Minimum order quantity is low, 1 sample can be provided for inspection.

Fourth quarter.


Question 4. How long does it take to get there? How do you ship the goods?

A: We usually ship by sea. It usually takes 30 days to get there. Air transport is also optional.


Question 5. How to order products?

A: First let us know your request or application.

Secondly, we offer according to your request or our suggestion.

Third, the customer confirmed the sample and paid a deposit for formal order.

Fourth, arrange production.


Question 6: Do you guarantee the products?

A: Yes, our products are guaranteed for one year.